Project Description

Project Name: New 36MW Data Center
Location: Itasca, IL
Completion Date: March 2023
Architect: HED – Boston, MA
Engineer: HED – Boston, MA
Contractor: Clune Construction Company
Project Manager: Tim Riordan
Project Type: Mission Critical | Data Center
Trades: Mechanical Piping & Sheet Metal

Project Description: The overall project consists of [2] 36MW Data Centers.  The current project (Phase 1 of 2) is the first data center that is scheduled to be completed with a 100% build out of 6 data vaults by March, 31 2023. The second (Phase 2) is a 36 MW data center that will be similar to phase 1 and is scheduled to start at the beginning of 2023.

Phase 1 data center has [6] 6MW high density data vaults. There are [36] 350 ton each air cooled chillers. The data vaults have chilled water fan walls for cooling.  The chilled water pumps are internal to each chiller.  The building is two stories.