Osi Enterprise


Project Details


  • Project Name: OSI Sausage Plant
  • Location: West Chicago, IL
  • Completion Date: March 2022
  • Architect: N/A
  • Engineer: AMS Industries, Inc.
  • Contractor: AMS Industries, Inc.
  • Project Manager: Mike Vranek
  • Project Type: Refrigeration, Steam, High Pressure Hot Water and Air Piping
  • Trades: Mechanical Piping, Sheet Metal & Electrical.

Project Description


The overall project consists of [2] 36MW Data Centers. The current project (Phase 1 of 2) is the first data center that is scheduled to be completed with a 100% build out of 6 data vaults by March, 31 2023. The second (Phase 2) is a 36 MW data center that will be similar to phase 1 and is scheduled to start at the beginning of 2023.

Phase 1 data center has [6] 6MW high density data vaults. There are [36] 350 ton each air cooled chillers. The data vaults have chilled water fan walls for cooling. The chilled water pumps are internal to each chiller. The building is two stories.