Confectionary Plant
Project Details
- Project Name: Confectionery Plant | HVAC Upgrade
- Location: Chicagoland
- Completion Date: May 2022
- Architect: N/A
- Engineer: GHAFARI
- Contractor: AMS Industries, Inc.
- Project Manager: Mike Catanzaro / Dave Dobson
- Project Type: Mechanical Equipment Infrastructure Upgrade (Process facility).
- Trades: Ductwork, Piping, Plumbing, Electrical, Structural, Fire Protection, Temperature Controls, General trades, and Mechanical demolition.
Project Description
The overall project consists of [2] 36MW Data Centers. The current project (Phase 1 of 2) is the first data center that is scheduled to be completed with a 100% build out of 6 data vaults by March, 31 2023. The second (Phase 2) is a 36 MW data center that will be similar to phase 1 and is scheduled to start at the beginning of 2023.
Phase 1 data center has [6] 6MW high density data vaults. There are [36] 350 ton each air cooled chillers. The data vaults have chilled water fan walls for cooling. The chilled water pumps are internal to each chiller. The building is two stories.